Playground Replacement Schedule 2018 - 2023
The Arlington Heights Park District schedules the replacement of each of its playgrounds on approximately a 18-23 year rotation.
For more information please contact the Parks and Planning Department at 847-577-3009.
2017/18 Concrete Improvements Project
The Arlington Heights Park District staff prepares and goes out for bid on Misc. Concrete Improvements Projects as part of the annual maintenance schedule to improve existing infrastructure throughout the park system. The concrete improvement projects typically include replacement of deteriorating paths in various parks with new, ADA compliant concrete walks. The scope of work may also include concrete pads for portable toilet enclosures, site amenities, and bench memorials donated by the public.
For the 2017/18 Concrete Improvements Project includes the following locations:
- Creekside Park (East) – Replacing an existing asphalt path with a new accessible concrete walk from the bridge to the Village Pump House Driveway.
- Parks Service Center – Pouring a new concrete pad for a material storage area for the Parks Department Staff. Furnish and install large concrete blocks for the material storage enclosure.
- Pioneer Park – Adding an accessible concrete walk, player's bench, & bleacher pads around the Baseball Field #2 backstop, and concrete pads for a portable toilet enclosure and bench.
For more information call the Parks and Planning Department at 847-577-3009