Current Bids, RFPs and RFQs
There are no current bids, RFPs, or RFQs at this time. Please check back later.
Opened Bids, RFPs and RFQs
Click on links to download a PDF copy of the Cost Summary and Award Documents
(bids that have been rejected are not listed)
Bid Closing Date/Time | Details |
F450 Chassis with 16′ Stake Bed or Equivalent 11/06/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Nickol Knoll Payton’s Hole Tee Renovation 10/15/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Heritage Swimming Pool Interior Finish 10/10/24 @ 12:00 am |
Plans / Specifications:
Bid Tab. /Cost Summary: |
ADA Concrete and Resurfacing 06/27/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Recreation Park – Building Demolition 06/11/24 @ 1:00 pm |
Plans / Specifications: Prospective bidders to contact LAMP, Inc. to be placed on a bidders list. Contact: kchristensen@lampinc.net or 847-741-7220 x 315.
Bid Tab. /Cost Summary: |
Recreation Park Phase I 05/23/24 @ 1:00 pm |
Plans / Specifications: Prospective bidders to contact LAMP, Inc. to be placed on a bidders list. Contact: kchristensen@lampinc.net or 847-741-7220 x 315.
Bid Tab. /Cost Summary: |
Sealcoating Bid 05/16/24 @ 1:00 pm |
Plans / Specifications:
Addendum:
Bid Tab. /Cost Summary: |
Green Slopes Park Pickleball Attenuation Panels 05/07/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Asphalt at Various Parks Bid 04/11/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Wearing Apparel Bid 2024 03/25/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Color Coating Bid 03/14/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Concrete Bid 09/14/23 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Tracked Boom Lift 05/25/23 @ 6:30 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Sport Court Replacement Bid 04/25/23 @ 1:00 pm |
Plans / Specifications:
Addendum:
Bid Tab. /Cost Summary: |
Wearing Apparel Bid 04/25/23 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
Boiler Replacement Bid 04/25/23 @ 1:00 pm |
Plans / Specifications:
Addendum:
Bid Tab. /Cost Summary: |
Pond Bank Stabilization Bid 02/25/23 @ 1:00 pm |
Advertisement Notice: Plans / Specifications:
Bid Tab. /Cost Summary: |