Current Bids, RFPs and RFQs
There are no current bids, RFPs, or RFQs at this time. Please check back later.
Opened Bids, RFPs and RFQs
Click on links to download a PDF copy of the Cost Summary and Award Documents
(bids that have been rejected are not listed)
| Bid Closing Date/Time | Details |
| Janitorial Services Bid 04/16/26 @ 1:00 pm |
Plans / Specifications: Addendum #2- New Floor Plans Janitorial Bid 2026 Addendum 2- 1. Rev ARC Facility Details Addendum 2- 2. Rev Seasonal Facility Pages
Bid Tab. /Cost Summary: |
| Wearing Apparel 2026 04/02/26 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| 2026 Bulk Fertilizer 01/20/26 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| ARC Electronic Sign 01/06/26 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Arlington Lakes Golf Club- New Wilke Rd. Fence Replacement 10/17/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Asbestos Abatement – Recreation Pool House 06/17/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Asbestos Abatement – Recreation 1937 Bathhouse Basement 06/17/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Asbestos Abatement – Administration Center Basement 06/17/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| 2025 Color Coating 05/29/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| 2025 Asphalt Sealcoating 05/29/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Heritage Pool Interior Finish 05/27/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Recreation Park – Phase 2 Community Building Renovation and New Pool & Bathhouse 05/16/25 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Portable Bathroom Units 12/19/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Bulk Fertilizer 12/18/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| F450 Chassis with 16′ Stake Bed or Equivalent 11/06/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Nickol Knoll Payton’s Hole Tee Renovation 10/15/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Heritage Swimming Pool Interior Finish 10/10/24 @ 12:00 am |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| ADA Concrete and Resurfacing 06/27/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Recreation Park – Building Demolition 06/11/24 @ 1:00 pm |
Plans / Specifications: Prospective bidders to contact LAMP, Inc. to be placed on a bidders list. Contact: kchristensen@lampinc.net or 847-741-7220 x 315.
Bid Tab. /Cost Summary: |
| Recreation Park Phase I 05/23/24 @ 1:00 pm |
Plans / Specifications: Prospective bidders to contact LAMP, Inc. to be placed on a bidders list. Contact: kchristensen@lampinc.net or 847-741-7220 x 315.
Bid Tab. /Cost Summary: |
| Sealcoating Bid 05/16/24 @ 1:00 pm |
Plans / Specifications:
Addendum:
Bid Tab. /Cost Summary: |
| Green Slopes Park Pickleball Attenuation Panels 05/07/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Asphalt at Various Parks Bid 04/11/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Wearing Apparel Bid 2024 03/25/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Color Coating Bid 03/14/24 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Concrete Bid 09/14/23 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Tracked Boom Lift 05/25/23 @ 6:30 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Sport Court Replacement Bid 04/25/23 @ 1:00 pm |
Plans / Specifications:
Addendum:
Bid Tab. /Cost Summary: |
| Wearing Apparel Bid 04/25/23 @ 1:00 pm |
Plans / Specifications:
Bid Tab. /Cost Summary: |
| Boiler Replacement Bid 04/25/23 @ 1:00 pm |
Plans / Specifications:
Addendum:
Bid Tab. /Cost Summary: |
| Pond Bank Stabilization Bid 02/25/23 @ 1:00 pm |
Advertisement Notice: Plans / Specifications:
Bid Tab. /Cost Summary: |